 |
|
 |
 |
United States Job Guide
For Labor / Trades
47-4091.00 - Segmental Pavers
Lay out, cut, and paste segmental paving units. Includes installers of bedding and restraining materials for the paving units. Tasks
Tasks- Cement the edges of the paved area.
- Cut paving stones to size and for edges, using a splitter and a masonry saw.
- Design paver installation layout pattern and create markings for directional references of joints and stringlines.
- Compact bedding sand and pavers to finish the paved area, using a plate compactor.
- Prepare base for installation by removing unstable or unsuitable materials, compacting and grading the soil, draining or stabilizing weak or saturated soils and taking measures to prevent water penetration and migration of bedding sand.
- Resurface an outside area with cobblestones, terracotta tiles, concrete or other materials.
- Screed sand level to an even thickness, and recheck sand exposed to elements, raking and rescreeding if necessary.
- Set pavers, aligning and spacing them correctly.
- Supply and place base materials, edge restraints, bedding sand and jointing sand.
- Sweep sand into the joints and compact pavement until the joints are full.
|
 |
 |
 |
 |